Fire Pump at APP Group
Again , Our Mechanical & Rotating dept won another Fire Pumps contract along with installation from the Indonesian largest Pulp & Paper Plant " APP group ".
Read More
Halberg Large Sea Water cooling pump at Badak NGL
We would like to thank PT. Badak NGL management who finally entrust the original equipment manufacturer "HALBERG Germany" to supply the OEM spare parts for HALBERG & BLACKE DURR sea water cooling pumps, which previously being supplied by non OEM supplier that does not meet PT. Badak demanding request on quality and services. Congratulations.
Read More
Site inspection at PKT Bontang
Checking the location along with Principal's before installing our large High Pressure and temperature Ball valve with approximately 6 meter width actuator for CFB Boiler.
Read More
Fitting Up venturi at Geothermal Project
We had successfully delivered a big size flow element (Venturi) for Geothermal and Coal Power Generation Projects
Read More
JICT RTGC electric upgrading
Again , Our Electrical Dept received another trust from Jakarta International Container Terminal to do electrical control upgrading as well as to recondition the electric motors for 5 (five ) RTGC . more than a dozen RTGC and several CC control system had been upgraded by Our Electrical Dept in cooperation with our Japanese Principal's .
Read More